Fence Post Concrete Calculator for Round Holes
Estimate the concrete around rectangular posts in round holes after subtracting the posts and any gravel bedding.
Your result
- Concrete per hole
- 1.401 ft³
- Measured concrete for all holes
- 11.205 ft³
- Concrete with allowance
- 0.457 yd³
- Whole bags
- 21 bags
Saved results stay in this browser.
Saved calculations and CSV
How the calculation works
Subtract the bedding thickness from the measured hole depth. Multiply the concrete depth by the difference between the circular hole area and the rectangular post area. Add your allowance to the volume of all holes before rounding up to bags.
Measure where the concrete will sit
The calculation assumes each post extends through the entire concrete depth and the hole has a consistent diameter. Measure different hole or post sizes as separate groups. Use the mixed yield printed on the concrete bag.